Concrete takeoffs and estimates

Footings, slabs and walls in cubic yards with rebar tonnage, so the pour schedule and the steel order come from the same sheet.

What we count

  • Pad and strip footings
  • Slabs on grade and toppings
  • Grade beams, piers and columns
  • Retaining walls and stairs
  • Pavers and driveways
  • Reinforcing steel by bar size
  • Vapor barrier and aggregate base

Reported in CY, SF, LF and tons. Wastage shown as its own column so you can adjust it.

What you receive

Excel

Quantity takeoff workbook

One row per item: drawing reference, description, quantity, unit, wastage, quantity with wastage, labor and material unit cost, and line total. Grouped by CSI division with subtotals.

PDF

Marked-up drawings

Every area, length and count is color-coded on the plans with a legend that ties back to the workbook. You can check any number in seconds.

Excel

Cost summary

Trade cost per division, cost per square foot, then overhead, insurance, contingency and tax at the percentages you use, ending in a suggested bid.

Standard turnaround
2 to 3 business days
Rush
24 hours
Revisions
14 days included

Concrete in delivered work

Foundation plan with the slab on grade shaded yellow and footings outlined, with a quantity legend

Altadena, California · April 2026

Two-story residence with ADU

Earthwork takeoff and priced estimate for excavation, backfill and compaction under the main house and the accessory dwelling unit.

  • Pad footing 3'-0" x 3'-0" x 2'-0"2 EA
  • Pad footing 2'-6" x 2'-6" x 2'-0"1 EA
  • Continuous footing 1'-6" x 2'-0"291.7 FT
Foundation plan with slab shaded blue and continuous footings traced

Altadena, California · April 2026

New single-family residence

Earthwork takeoff and priced estimate for excavation, backfill and compaction from the foundation plan.

  • Continuous footing 1'-3" x 2'-0"225.0 FT
  • Continuous footing 1'-0" x 1'-6"67.9 FT
  • 5" concrete slab on grade1,619.9 SF

Need concrete numbers for a bid?

Upload a set and tell us the trades and the due date. You will hear back within one business day with a price and a delivery date.