Division 07
Roofing takeoffs and estimates
Roof area by slope and system with every accessory that rides along: underlayment, flashing, vents, gutters and downspouts.
What we count
- Shingle, tile and metal roofing
- Flat and low-slope membranes
- Underlayment and ice-and-water shield
- Flashings, vents and scuppers
- Gutters and downspouts
- Soffit and ridge vents
Reported in SQ, SF and LF. Wastage shown as its own column so you can adjust it.
What you receive
Excel
Quantity takeoff workbook
One row per item: drawing reference, description, quantity, unit, wastage, quantity with wastage, labor and material unit cost, and line total. Grouped by CSI division with subtotals.
Marked-up drawings
Every area, length and count is color-coded on the plans with a legend that ties back to the workbook. You can check any number in seconds.
Excel
Cost summary
Trade cost per division, cost per square foot, then overhead, insurance, contingency and tax at the percentages you use, ending in a suggested bid.
- Standard turnaround
- 2 to 3 business days
- Rush
- 24 hours
- Revisions
- 14 days included
Need roofing numbers for a bid?
Upload a set and tell us the trades and the due date. You will hear back within one business day with a price and a delivery date.