Masonry takeoffs and estimates

Block and brick by unit type and size, plus the accessories that get missed: flashing, weeps, angles and scaffold time.

What we count

  • CMU by size and grout schedule
  • Brick veneer and units
  • Stone and cast stone
  • Precast sills, copings and caps
  • Through-wall flashing and weeps
  • Steel lintels and angles
  • Scaffolding

Reported in SF, EA, LF and units. Wastage shown as its own column so you can adjust it.

What you receive

Excel

Quantity takeoff workbook

One row per item: drawing reference, description, quantity, unit, wastage, quantity with wastage, labor and material unit cost, and line total. Grouped by CSI division with subtotals.

PDF

Marked-up drawings

Every area, length and count is color-coded on the plans with a legend that ties back to the workbook. You can check any number in seconds.

Excel

Cost summary

Trade cost per division, cost per square foot, then overhead, insurance, contingency and tax at the percentages you use, ending in a suggested bid.

Standard turnaround
2 to 3 business days
Rush
24 hours
Revisions
14 days included

Masonry in delivered work

Attic plan with loft flooring shaded and handrail and cove base traced

Ellsworth, Maine · April 2026

Modular chalet, interior finishes

Interior finishes estimate across six divisions, with two kitchen layouts priced as separate options.

  • Hand rail24.8 FT
  • 6" cove base71.2 FT
  • Brownstone flooring323.2 SF