Division 02
Demolition takeoffs and estimates
Selective and full demolition quantified by assembly so the dumpster count and labor hours line up with what is actually coming out.
What we count
- Structure and partitions
- Flooring, ceilings and finishes
- CMU and exterior finishes
- Roof and openings
- Shoring during demo
- Plumbing, electrical and HVAC removals
- Site and cabinetry
Reported in SF, LF, CY and EA. Wastage shown as its own column so you can adjust it.
What you receive
Excel
Quantity takeoff workbook
One row per item: drawing reference, description, quantity, unit, wastage, quantity with wastage, labor and material unit cost, and line total. Grouped by CSI division with subtotals.
Marked-up drawings
Every area, length and count is color-coded on the plans with a legend that ties back to the workbook. You can check any number in seconds.
Excel
Cost summary
Trade cost per division, cost per square foot, then overhead, insurance, contingency and tax at the percentages you use, ending in a suggested bid.
- Standard turnaround
- 2 to 3 business days
- Rush
- 24 hours
- Revisions
- 14 days included
Need demolition numbers for a bid?
Upload a set and tell us the trades and the due date. You will hear back within one business day with a price and a delivery date.