Formwork takeoffs and estimates

Contact area for every concrete element, with reuse factored, so the form package and labor are priced on real square footage.

What we count

  • Footing and grade beam forms
  • Wall forms by height
  • Slab edge forms
  • Pier and column forms
  • Retaining wall and stair forms
  • Blockouts and embeds

Reported in SFCA and LF. Wastage shown as its own column so you can adjust it.

What you receive

Excel

Quantity takeoff workbook

One row per item: drawing reference, description, quantity, unit, wastage, quantity with wastage, labor and material unit cost, and line total. Grouped by CSI division with subtotals.

PDF

Marked-up drawings

Every area, length and count is color-coded on the plans with a legend that ties back to the workbook. You can check any number in seconds.

Excel

Cost summary

Trade cost per division, cost per square foot, then overhead, insurance, contingency and tax at the percentages you use, ending in a suggested bid.

Standard turnaround
2 to 3 business days
Rush
24 hours
Revisions
14 days included