Division 07
Insulation and waterproofing takeoffs and estimates
Thermal, moisture and fire-stopping materials by R-value and location, from foundation waterproofing to roof insulation.
What we count
- Batt and blown wall insulation
- Rigid board and continuous insulation
- Roof and floor insulation
- Foundation waterproofing
- Spray fireproofing
- Fire-stopping at penetrations
Reported in SF and LF. Wastage shown as its own column so you can adjust it.
What you receive
Excel
Quantity takeoff workbook
One row per item: drawing reference, description, quantity, unit, wastage, quantity with wastage, labor and material unit cost, and line total. Grouped by CSI division with subtotals.
Marked-up drawings
Every area, length and count is color-coded on the plans with a legend that ties back to the workbook. You can check any number in seconds.
Excel
Cost summary
Trade cost per division, cost per square foot, then overhead, insurance, contingency and tax at the percentages you use, ending in a suggested bid.
- Standard turnaround
- 2 to 3 business days
- Rush
- 24 hours
- Revisions
- 14 days included
Need insulation and waterproofing numbers for a bid?
Upload a set and tell us the trades and the due date. You will hear back within one business day with a price and a delivery date.