Skip to content
Estimex

Division 09

Flooring takeoffs and estimates

Every finish by room with subfloor prep, transitions and base, so nothing is left to be discovered on site.

What we count

  • Tile, stone and marble
  • Hardwood and engineered wood
  • Luxury vinyl plank and sheet vinyl
  • Carpet and carpet tile
  • Wall base and cove base
  • Transition strips and saddles
  • Underlayment and prep

Reported in SF and LF. Wastage shown as its own column so you can adjust it.

What you receive

Excel

Quantity takeoff workbook

One row per item: drawing reference, description, quantity, unit, wastage, quantity with wastage, labor and material unit cost, and line total. Grouped by CSI division with subtotals.

PDF

Marked-up drawings

Every area, length and count is color-coded on the plans with a legend that ties back to the workbook. You can check any number in seconds.

Excel

Cost summary

Trade cost per division, cost per square foot, then overhead, insurance, contingency and tax at the percentages you use, ending in a suggested bid.

Standard turnaround
2 to 3 business days
Rush
24 hours
Revisions
14 days included

Flooring in delivered work

Attic plan with loft flooring shaded and handrail and cove base traced

Ellsworth, Maine · April 2026

Modular chalet, interior finishes

Interior finishes estimate across six divisions, with two kitchen layouts priced as separate options.

  • Hand rail24.8 FT
  • 6" cove base71.2 FT
  • Brownstone flooring323.2 SF

Need flooring numbers for a bid?

Upload a set and tell us the trades and the due date. You will hear back within one business day with a price and a delivery date.