Skip to content
Estimex

Division 08

Openings, storefront and glazing takeoffs and estimates

Doors, windows and storefront by size and type with hardware sets and trims scheduled against the door and window schedules.

What we count

  • Doors, frames and hardware sets
  • Windows by size and type
  • Storefront and curtain wall
  • Skylights and glass partitions
  • Shutters, shades and blinds
  • Door and window trims

Reported in EA, SF and LF. Wastage shown as its own column so you can adjust it.

What you receive

Excel

Quantity takeoff workbook

One row per item: drawing reference, description, quantity, unit, wastage, quantity with wastage, labor and material unit cost, and line total. Grouped by CSI division with subtotals.

PDF

Marked-up drawings

Every area, length and count is color-coded on the plans with a legend that ties back to the workbook. You can check any number in seconds.

Excel

Cost summary

Trade cost per division, cost per square foot, then overhead, insurance, contingency and tax at the percentages you use, ending in a suggested bid.

Standard turnaround
2 to 3 business days
Rush
24 hours
Revisions
14 days included

Openings, storefront and glazing in delivered work

Attic plan with loft flooring shaded and handrail and cove base traced

Ellsworth, Maine · April 2026

Modular chalet, interior finishes

Interior finishes estimate across six divisions, with two kitchen layouts priced as separate options.

  • Hand rail24.8 FT
  • 6" cove base71.2 FT
  • Brownstone flooring323.2 SF

Need openings, storefront and glazing numbers for a bid?

Upload a set and tell us the trades and the due date. You will hear back within one business day with a price and a delivery date.