Division 21
Fire protection takeoffs and estimates
Sprinkler heads, pipe by diameter and pumps counted from the fire protection drawings or laid out from the code coverage.
What we count
- Sprinkler heads by type
- Pipe by diameter and hanger count
- Fire pumps and risers
- Valves, backflow and connections
- Fire extinguishers and cabinets
Reported in EA and LF. Wastage shown as its own column so you can adjust it.
What you receive
Excel
Quantity takeoff workbook
One row per item: drawing reference, description, quantity, unit, wastage, quantity with wastage, labor and material unit cost, and line total. Grouped by CSI division with subtotals.
Marked-up drawings
Every area, length and count is color-coded on the plans with a legend that ties back to the workbook. You can check any number in seconds.
Excel
Cost summary
Trade cost per division, cost per square foot, then overhead, insurance, contingency and tax at the percentages you use, ending in a suggested bid.
- Standard turnaround
- 2 to 3 business days
- Rush
- 24 hours
- Revisions
- 14 days included
Need fire protection numbers for a bid?
Upload a set and tell us the trades and the due date. You will hear back within one business day with a price and a delivery date.