Divisions 04 and 09
Facade repair and restoration takeoffs and estimates
Repair scopes measured from elevation drawings and survey notes, itemized so the bid separates rebuild from repoint from repaint.
What we count
- Parapet rebuild and sill replacement
- Brick replacement and repointing
- Mortar and caulk replacement
- Stucco refinishing
- Railing and brick repainting
- Waterproofing coatings
Reported in SF, LF and EA. Wastage shown as its own column so you can adjust it.
What you receive
Excel
Quantity takeoff workbook
One row per item: drawing reference, description, quantity, unit, wastage, quantity with wastage, labor and material unit cost, and line total. Grouped by CSI division with subtotals.
Marked-up drawings
Every area, length and count is color-coded on the plans with a legend that ties back to the workbook. You can check any number in seconds.
Excel
Cost summary
Trade cost per division, cost per square foot, then overhead, insurance, contingency and tax at the percentages you use, ending in a suggested bid.
- Standard turnaround
- 2 to 3 business days
- Rush
- 24 hours
- Revisions
- 14 days included
Need facade repair and restoration numbers for a bid?
Upload a set and tell us the trades and the due date. You will hear back within one business day with a price and a delivery date.